Ultimaker S5
Maintenance
Every 2 months
-
wash build plate with warm water
heat up nozzles to 150°C and remove plastic stuck on the nozzle (with tweezers or a paper towel)
clean Bowden tube by pushing a piece of sponge trough. Tight fit, and a new piece of sponge per tube.
-
Every 6 months
Yearly